Have your say

On proposals for 80 homes at Land North of Haine Road, Broadstairs.

Vistry is preparing a planning application and would like to hear the views of the community. The consultation is open until Monday 31 August 2026.

Welcome

Vistry is preparing proposals for 80 homes on land north of Haine Road, Broadstairs, the final phase of development within the neighbourhood.

This land was originally set aside for a primary school. Kent County Council, which is responsible for providing school places, has confirmed it no longer needs the site for a school and has formally released the land. You can read more in our FAQs below.

The site sits within the wider area covered by an existing outline planning permission, and this wider area is allocated in the Council's Local Plan for around 1,020 new homes. We are making a full planning application, seeking approval for the complete details of the scheme: the layout, the look of the homes, the landscaping, the access and the scale. Your views help shape those details before we submit.

Before we submit our application to Thanet District Council, we want to gather feedback from the community. Your feedback will be reviewed by the project team and submitted alongside our application.

The consultation is open from Monday 17 August 2026 to Monday 31 August 2026.

80 homesincluding 30% affordable
Public open spacewith children's play areas
New trees, hedgerowsand wildlife habitat

The site

The site sits north of Haine Road and west of Nash Road, within the established neighbourhood that has been built out over the past fifteen years. Around 971 homes have been completed here so far.

It is the final undeveloped parcel in this part of the neighbourhood.

The site in context. Indicative only. Base map © OpenStreetMap contributors.

The proposals

Our proposals are for 80 homes, designed to fit with the surrounding streets.

  • 80 homes in total
  • 24 affordable homes (30%), for local people through rent and shared ownership routes
  • A mix of 1, 2 and 3 bedroom homes: houses plus one small apartment building
  • Houses of two and two-and-a-half storeys; a single three-storey apartment building of 9 flats, positioned to reflect the taller buildings opposite
  • All homes meet national space standards
  • A number of homes built to accessible and adaptable standards
Indicative site layout.

The red line shows the planning application boundary. A fully coloured layout plan will follow.

Green space & nature

Around a quarter of a hectare of the site is given over to open space, more than double what planning policy requires for a development of this size.

  • Two areas of open space, each with a children's play area, so every home is within a short walk of somewhere to play
  • Significant new tree planting and roughly 378 metres of new native hedgerow
  • New wildflower and wetland planting, species-rich grassland and rain gardens
  • Sustainable drainage basins — grassed hollows that collect rainwater during heavy rain and stay dry the rest of the time, so they can be used as open space
  • A net gain in biodiversity: the site will support more wildlife after development than it does today

There is also an existing larger play area and areas of open space nearby, within the surrounding neighbourhood.

Indicative landscape and biodiversity strategy.

Getting around

  • Two vehicle access points from the existing road to the north-east
  • A tree-lined main street with grass verges to create a green entrance into the development
  • Parking provided in line with Kent County Council's parking standards, including visitor spaces
  • Parking arranged to avoid cars dominating the street scene, with homes fronting parking areas, planting and street trees

Frequently asked questions

We know you'll have questions about these proposals. The one most people ask is about the school, so we've answered that first, along with others below.

Wasn't this land meant to be a school?

Yes. When outline planning permission for the wider neighbourhood was granted (the initial, overarching approval that set the principles for the whole area, with the details of each part settled later), this parcel was set aside so that Kent County Council could build a two-form-entry primary school here if it decided one was needed.

So why isn't it being built?

Kent County Council is the authority responsible for planning and providing school places. Following discussions, Kent County Council confirmed in writing that it does not need this site for a school and has formally released the land from that requirement.

Can Vistry build the school instead?

No. Deciding where new schools are needed, funding them and running them is Kent County Council's responsibility, not a housebuilder's. We cannot require Kent County Council to build a school, and we cannot build or operate one ourselves.

Was housing on this land always a possibility?

Yes. When outline permission was granted, the environmental assessment looked at what would happen if the school were not built and homes were provided instead — up to 1,130 homes across the whole neighbourhood. So the possibility of homes on this site, and the effects of building them, have already been assessed and accepted.

Why does this site need its own planning application?

The wider neighbourhood is allocated in the Council's Local Plan (Policy SP19) for around 1,020 new homes, but only 971 have been built so far — a shortfall of about 49 homes. Building homes here would help make up that shortfall and add to the homes the area is meant to deliver, helping the Council meet its housing targets. Because the total would end up a little above the number approved under the original outline permission, this phase is coming forward as its own full planning application.

What about school places for the new homes?

Contributions towards local school places and other community infrastructure are agreed with the councils as part of the planning process, and would apply to this development.

How many homes are proposed, and what type?

80 homes in total: a mix of 1, 2 and 3 bedroom houses, plus one small apartment building of 9 flats. Twenty-four of the homes (30%) would be affordable, for local people through rent and shared ownership routes. All homes meet national space standards, and a number are built to accessible and adaptable standards.

How tall will the buildings be?

Most homes are houses of two and two-and-a-half storeys. There is one three-storey apartment building of 9 flats, positioned to reflect the taller buildings opposite.

What green space and landscaping is planned?

Around a quarter of a hectare is given over to open space, which is more than double what planning policy requires for a development of this size. There are two areas of open space, each with a children's play area, significant new tree planting and roughly 378 metres of new native hedgerow, along with wildflower and wetland planting. The scheme is designed to deliver a net gain in biodiversity, so the site will support more wildlife after development than it does today.

How will people get around, and where will they park?

There are two vehicle access points from the existing road to the north-east, and a tree-lined main street with grass verges. Parking is provided in line with Kent County Council's parking standards, including visitor spaces, and is arranged so that cars do not dominate the street scene.

Will there be allotments?

Thanet District Council has asked whether local people would use allotments if they were provided nearby. If that would interest you, please let us know in the survey below.

When will the application be validated, and what happens next?

We expect the application to be validated by Thanet District Council in September 2026. After that, the Council carries out its own formal consultation, when you can comment directly to them, before it makes a decision.

How can I have my say, and will it make a difference?

You can complete the survey below. Your feedback is reviewed by the project team and used to refine the plans, and a summary is submitted to Thanet District Council alongside the application. Your comments help shape the details of the scheme before we submit.

Have your say

Your feedback will help the project team understand local priorities, identify any issues that need to be explained more clearly, and consider where details of the scheme can be refined before the application is submitted. The survey takes about five minutes. All questions are optional except where marked.

About 5 minutes

Thank you, your response has been recorded

We appreciate you taking the time. Your feedback will be reviewed by the project team and a summary will be submitted to Thanet District Council alongside our planning application.

If you asked to stay informed, we'll be in touch with updates about the development.

About you

Optional. Helps us understand where responses come from.

What's your connection to the area?
The proposals

How do you rate each of the following?

The layout and design of the homes
The amount and quality of open space and play areas
The provision of affordable homes
Access, roads and parking
Landscaping, trees and wildlife
Overall, how do you feel about the proposals?
Allotments and community growing

Thanet District Council has asked whether local people would use allotments if they were provided nearby. Your answers here help us give the Council a clear picture.

Would you be interested in using an allotment or community growing plot if one were provided nearby?
How likely would you be to rent a plot within the next two years?
Would you be willing to pay an annual rent for a plot?
Are you currently on a waiting list for an allotment locally?
Your comments
Staying informed

Optional.

Optional. Only needed if you'd like updates.

Please enter a valid email address, or leave this blank.
Please confirm you've read and accept the privacy notice.
Please note: a summary of the feedback we receive (including comments, but not your name or contact details) may be included in the public planning documents we submit to Thanet District Council. See our privacy notice for how we handle your information.

What happens next

  1. 1

    Consultation open

    17 to 31 August 2026

    You share your views.

  2. 2

    We review feedback

    Comments are reviewed by the project team and used to refine the plans.

  3. 3

    Application validated

    September 2026

    Our application is validated by Thanet District Council and includes a summary of the consultation feedback.

  4. 4

    The council decides

    Thanet District Council consults again formally, and you can comment directly to them.

Have your say